Skip to main content
LTi, PT Lintas Telekomunikasi Indonesia

Nine service lines

Electrical Engineering

Electrical installation and engineering built to safety standards, not merely to switch on.

A tidy panel is not about looks. It determines how long a repair takes and how much risk there is when something faults. We handle panel installation, power routing, earthing, and current protection to the applicable standards, complete with testing and signed records. For server rooms and communication equipment we also cover UPS and backup power paths.

  • Distribution panel installation and modification
  • Power routing and earthing
  • Current protection and breaker coordination
  • UPS and backup power for server rooms
  • Testing, labelling, and signed handover records

Typical delivery time

3–6 weeks preparation, 1–3 days installation

Free Consultation

Questions That Come Up

As briefly as possible, because the panel is assembled and fully tested at the workshop first. On a warehouse main panel replacement, recorded downtime was eleven hours, all of it on a non-operating day.

Yes. Insulation and continuity testing, as-built drawings, and circuit labelling are part of handover and become yours.

Let's Build Your Technology Roadmap, Together

From infrastructure and networking to security and communication systems, LTI has helped 540+ businesses across Indonesia run safer and more efficiently. Whatever stage you are at, whether planning a new system, upgrading legacy infrastructure, or looking for a long-term maintenance partner, our team is ready to map out a solution.

Glowing network pattern